{"id":244,"date":"2021-12-02T09:42:11","date_gmt":"2021-12-02T09:42:11","guid":{"rendered":"https:\/\/www.jasperproducts.co.uk\/news\/?p=244"},"modified":"2026-02-10T13:30:38","modified_gmt":"2026-02-10T13:30:38","slug":"rail-maintenance-platform","status":"publish","type":"post","link":"https:\/\/www.jasperproducts.co.uk\/news\/rail-maintenance-platform\/","title":{"rendered":"GRP Rail Maintenance Walkway &amp; Platform"},"content":{"rendered":"\n<h4 class=\"wp-block-heading\"><em>South Eastern Railway &#8211; GRP Walkway &#8211; Victoria  Light Maintenance Depot <\/em><\/h4>\n\n\n\n<p>On average, 1.7 billion people use the British railway each year. Consequently, the network relies on thousands of engineered components. Many are unseen structural elements that act like cogs behind the railway\u2019s clockface. As a result, our GRP walkway and platform system keeps those cogs aligned and Britain moving safely.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Precision Engineering at Victoria Depot<\/strong><\/h3>\n\n\n\n<p>Jasper Products designed, fabricated, and installed a 560m GRP walkway at Southeastern Railway\u2019s Victoria depot. Therefore, the project demonstrates precision rail engineering. Simple decisions, such as platform height and width, soon became complex challenges. However, detailed planning, accurate surveying, and careful calculation resolved each issue.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Engineering for Height Consistency<\/strong><\/h3>\n\n\n\n<p>A topographical survey revealed major ground\u2011level variation along the depot. Consequently, the team engineered every walkway section to precise, location\u2011specific dimensions. This ensured a consistent platform height beside the train carriages.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Designing for Multiple Train Types<\/strong><\/h3>\n\n\n\n<p>Width required equal attention. Additionally, many train models and carriage types may dock at the station. Therefore, the walkway could not exceed the largest carriage profile. Each train moves within a dynamic envelope that shifts on straights and curves. The walkway therefore needed to allow maximum overthrow while keeping operatives safe. Meanwhile, the team minimised the gap between train and walkway to reduce risk.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">M<strong>eeting Safety Standards<\/strong><\/h3>\n\n\n\n<p>The team calculated height and width in strict accordance with Railway Group Standards. Furthermore, these standards ensured full operational compliance.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Why GRP Was the Right Choice<\/strong><\/h3>\n\n\n\n<p>Mathematics was not the only priority. Instead, the design also needed durability, low maintenance, and a safe working environment. GRP provides all three benefits in modern rail infrastructure. Its corrosion resistance and long service life offer clear advantages over traditional materials.<\/p>\n\n\n\n<p>The team therefore chose to fabricate the walkway and platform almost entirely from GRP. As a result, the depot gained a safer and more efficient working platform that will perform for decades.<\/p>\n\n\n\n<p>Keeping maintenance operatives safe and providing them with uncomplicated, intuitive access to perform their necessary work is an important step in the process of maintaining the rail network. It is thanks to careful background jobs like these across the country that keep the trains moving, and people all over Britain connected. <\/p>\n\n\n\n<p>See more of our bespoke work platforms here <a href=\"https:\/\/www.jasperproducts.co.uk\/work-platforms\" target=\"_blank\" rel=\"noreferrer noopener\">Innovative Ideas<\/a><\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\"><div class=\"wp-block-image wp-block-image alignleft size-large is-resized\">\n<figure ><img loading=\"lazy\" decoding=\"async\" width=\"768\" height=\"1024\" data-id=\"249\" src=\"https:\/\/www.jasperproducts.co.uk\/news\/wp-content\/uploads\/2021\/11\/IMG-20190331-WA0023.png\" alt=\"Bespoke rail maintenance Platform and walkway installed in cleaning shed\" class=\"wp-image-249\" style=\"width:243px;height:auto\" srcset=\"https:\/\/www.jasperproducts.co.uk\/news\/wp-content\/uploads\/2021\/11\/IMG-20190331-WA0023.png 768w, https:\/\/www.jasperproducts.co.uk\/news\/wp-content\/uploads\/2021\/11\/IMG-20190331-WA0023-225x300.png 225w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/><figcaption class=\"wp-element-caption\">Bespoke rail maintenance Platform made from GRP<\/figcaption><\/figure>\n<\/div>\n\n\n<figure class=\"wp-block-image size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"768\" height=\"1024\" data-id=\"368\" src=\"https:\/\/www.jasperproducts.co.uk\/news\/wp-content\/uploads\/2025\/02\/GRP-train-access-ramp.png\" alt=\"access ramp for train maintenance Platform\" class=\"wp-image-368\" style=\"width:271px;height:auto\" srcset=\"https:\/\/www.jasperproducts.co.uk\/news\/wp-content\/uploads\/2025\/02\/GRP-train-access-ramp.png 768w, https:\/\/www.jasperproducts.co.uk\/news\/wp-content\/uploads\/2025\/02\/GRP-train-access-ramp-225x300.png 225w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/><figcaption class=\"wp-element-caption\">GRP train access ramp<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"768\" height=\"1024\" data-id=\"248\" src=\"https:\/\/www.jasperproducts.co.uk\/news\/wp-content\/uploads\/2021\/11\/IMG-20190502-WA0000.png\" alt=\"GRP walkway with removable handrails\" class=\"wp-image-248\" style=\"width:229px;height:auto\" srcset=\"https:\/\/www.jasperproducts.co.uk\/news\/wp-content\/uploads\/2021\/11\/IMG-20190502-WA0000.png 768w, https:\/\/www.jasperproducts.co.uk\/news\/wp-content\/uploads\/2021\/11\/IMG-20190502-WA0000-225x300.png 225w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/><figcaption class=\"wp-element-caption\">Rail depot GRP walkway and Platform<\/figcaption><\/figure>\n<\/figure>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"alignright size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"698\" src=\"https:\/\/www.jasperproducts.co.uk\/news\/wp-content\/uploads\/2021\/12\/handrailprntscrn-1024x698.png\" alt=\"drawing of bespoke walkway and platfrom made in GRP\" class=\"wp-image-269\" srcset=\"https:\/\/www.jasperproducts.co.uk\/news\/wp-content\/uploads\/2021\/12\/handrailprntscrn-1024x698.png 1024w, https:\/\/www.jasperproducts.co.uk\/news\/wp-content\/uploads\/2021\/12\/handrailprntscrn-300x204.png 300w, https:\/\/www.jasperproducts.co.uk\/news\/wp-content\/uploads\/2021\/12\/handrailprntscrn-768x523.png 768w, https:\/\/www.jasperproducts.co.uk\/news\/wp-content\/uploads\/2021\/12\/handrailprntscrn.png 1217w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">drawing of handrail system<\/figcaption><\/figure>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>South Eastern Railway &#8211; GRP Walkway &#8211; Victoria Light Maintenance Depot On average, 1.7 billion people use the British railway each year. Consequently, the network relies on thousands of engineered components. Many are unseen structural elements that act like cogs behind the railway\u2019s clockface. As a result, our GRP walkway and platform system keeps those [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":246,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[8],"tags":[2,17,19],"class_list":["post-244","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-rail-maintenance-platforms","tag-bespoke-work-platforms","tag-grp-work-platforms","tag-train-maintenance"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>GRP Rail Maintenance Walkway &amp; Platform<\/title>\n<meta name=\"description\" content=\"Discover how Jasper Products engineered and installed a 560m GRP rail maintenance walkway at Victoria depot, designed to meet Railway Group Standards with precision and safety.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.jasperproducts.co.uk\/news\/rail-maintenance-platform\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"GRP Rail Maintenance Walkway &amp; Platform\" \/>\n<meta property=\"og:description\" content=\"Discover how Jasper Products engineered and installed a 560m GRP rail maintenance walkway at Victoria depot, designed to meet Railway Group Standards with precision and safety.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.jasperproducts.co.uk\/news\/rail-maintenance-platform\/\" \/>\n<meta property=\"og:site_name\" content=\"Jasper Products Ltd\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/JasperProductsLtd\" \/>\n<meta property=\"article:published_time\" content=\"2021-12-02T09:42:11+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-02-10T13:30:38+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.jasperproducts.co.uk\/news\/wp-content\/uploads\/2021\/11\/IMG-20190331-WA0002-4.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"398\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"JPL\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"JPL\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.jasperproducts.co.uk\/news\/rail-maintenance-platform\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.jasperproducts.co.uk\/news\/rail-maintenance-platform\/\"},\"author\":{\"name\":\"JPL\",\"@id\":\"https:\/\/www.jasperproducts.co.uk\/news\/#\/schema\/person\/451004a0120698172de889fcca133f32\"},\"headline\":\"GRP Rail Maintenance Walkway &amp; Platform\",\"datePublished\":\"2021-12-02T09:42:11+00:00\",\"dateModified\":\"2026-02-10T13:30:38+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.jasperproducts.co.uk\/news\/rail-maintenance-platform\/\"},\"wordCount\":408,\"publisher\":{\"@id\":\"https:\/\/www.jasperproducts.co.uk\/news\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.jasperproducts.co.uk\/news\/rail-maintenance-platform\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.jasperproducts.co.uk\/news\/wp-content\/uploads\/2021\/11\/IMG-20190331-WA0002-4.png\",\"keywords\":[\"Bespoke work platforms\",\"GRP Work Platforms\",\"train maintenance\"],\"articleSection\":[\"Rail Maintenance Platforms\"],\"inLanguage\":\"en-GB\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.jasperproducts.co.uk\/news\/rail-maintenance-platform\/\",\"url\":\"https:\/\/www.jasperproducts.co.uk\/news\/rail-maintenance-platform\/\",\"name\":\"GRP Rail Maintenance Walkway &amp; Platform\",\"isPartOf\":{\"@id\":\"https:\/\/www.jasperproducts.co.uk\/news\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.jasperproducts.co.uk\/news\/rail-maintenance-platform\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.jasperproducts.co.uk\/news\/rail-maintenance-platform\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.jasperproducts.co.uk\/news\/wp-content\/uploads\/2021\/11\/IMG-20190331-WA0002-4.png\",\"datePublished\":\"2021-12-02T09:42:11+00:00\",\"dateModified\":\"2026-02-10T13:30:38+00:00\",\"description\":\"Discover how Jasper Products engineered and installed a 560m GRP rail maintenance walkway at Victoria depot, designed to meet Railway Group Standards with precision and safety.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.jasperproducts.co.uk\/news\/rail-maintenance-platform\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.jasperproducts.co.uk\/news\/rail-maintenance-platform\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/www.jasperproducts.co.uk\/news\/rail-maintenance-platform\/#primaryimage\",\"url\":\"https:\/\/www.jasperproducts.co.uk\/news\/wp-content\/uploads\/2021\/11\/IMG-20190331-WA0002-4.png\",\"contentUrl\":\"https:\/\/www.jasperproducts.co.uk\/news\/wp-content\/uploads\/2021\/11\/IMG-20190331-WA0002-4.png\",\"width\":1024,\"height\":398},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.jasperproducts.co.uk\/news\/rail-maintenance-platform\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.jasperproducts.co.uk\/news\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"GRP Rail Maintenance Walkway &amp; Platform\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.jasperproducts.co.uk\/news\/#website\",\"url\":\"https:\/\/www.jasperproducts.co.uk\/news\/\",\"name\":\"Jasper Products News\",\"description\":\"Latest News about Aluminium work Platforms\",\"publisher\":{\"@id\":\"https:\/\/www.jasperproducts.co.uk\/news\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.jasperproducts.co.uk\/news\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.jasperproducts.co.uk\/news\/#organization\",\"name\":\"Jasper Products News\",\"url\":\"https:\/\/www.jasperproducts.co.uk\/news\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/www.jasperproducts.co.uk\/news\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.jasperproducts.co.uk\/news\/wp-content\/uploads\/2026\/02\/cropped-301103577_184198737330913_2960838573356138074_n.jpg\",\"contentUrl\":\"https:\/\/www.jasperproducts.co.uk\/news\/wp-content\/uploads\/2026\/02\/cropped-301103577_184198737330913_2960838573356138074_n.jpg\",\"width\":512,\"height\":512,\"caption\":\"Jasper Products News\"},\"image\":{\"@id\":\"https:\/\/www.jasperproducts.co.uk\/news\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/JasperProductsLtd\",\"https:\/\/www.youtube.com\/@JasperProducts-v7y\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.jasperproducts.co.uk\/news\/#\/schema\/person\/451004a0120698172de889fcca133f32\",\"name\":\"JPL\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/secure.gravatar.com\/avatar\/8c14b4bc180d7c3cbafbbf89703fdd5287849e7cc54b4b21f987675433b776fd?s=96&d=mm&r=g\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/8c14b4bc180d7c3cbafbbf89703fdd5287849e7cc54b4b21f987675433b776fd?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/8c14b4bc180d7c3cbafbbf89703fdd5287849e7cc54b4b21f987675433b776fd?s=96&d=mm&r=g\",\"caption\":\"JPL\"},\"url\":\"https:\/\/www.jasperproducts.co.uk\/news\/author\/jasper_products\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"GRP Rail Maintenance Walkway &amp; Platform","description":"Discover how Jasper Products engineered and installed a 560m GRP rail maintenance walkway at Victoria depot, designed to meet Railway Group Standards with precision and safety.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.jasperproducts.co.uk\/news\/rail-maintenance-platform\/","og_locale":"en_GB","og_type":"article","og_title":"GRP Rail Maintenance Walkway &amp; Platform","og_description":"Discover how Jasper Products engineered and installed a 560m GRP rail maintenance walkway at Victoria depot, designed to meet Railway Group Standards with precision and safety.","og_url":"https:\/\/www.jasperproducts.co.uk\/news\/rail-maintenance-platform\/","og_site_name":"Jasper Products Ltd","article_publisher":"https:\/\/www.facebook.com\/JasperProductsLtd","article_published_time":"2021-12-02T09:42:11+00:00","article_modified_time":"2026-02-10T13:30:38+00:00","og_image":[{"width":1024,"height":398,"url":"https:\/\/www.jasperproducts.co.uk\/news\/wp-content\/uploads\/2021\/11\/IMG-20190331-WA0002-4.png","type":"image\/png"}],"author":"JPL","twitter_card":"summary_large_image","twitter_misc":{"Written by":"JPL","Estimated reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.jasperproducts.co.uk\/news\/rail-maintenance-platform\/#article","isPartOf":{"@id":"https:\/\/www.jasperproducts.co.uk\/news\/rail-maintenance-platform\/"},"author":{"name":"JPL","@id":"https:\/\/www.jasperproducts.co.uk\/news\/#\/schema\/person\/451004a0120698172de889fcca133f32"},"headline":"GRP Rail Maintenance Walkway &amp; Platform","datePublished":"2021-12-02T09:42:11+00:00","dateModified":"2026-02-10T13:30:38+00:00","mainEntityOfPage":{"@id":"https:\/\/www.jasperproducts.co.uk\/news\/rail-maintenance-platform\/"},"wordCount":408,"publisher":{"@id":"https:\/\/www.jasperproducts.co.uk\/news\/#organization"},"image":{"@id":"https:\/\/www.jasperproducts.co.uk\/news\/rail-maintenance-platform\/#primaryimage"},"thumbnailUrl":"https:\/\/www.jasperproducts.co.uk\/news\/wp-content\/uploads\/2021\/11\/IMG-20190331-WA0002-4.png","keywords":["Bespoke work platforms","GRP Work Platforms","train maintenance"],"articleSection":["Rail Maintenance Platforms"],"inLanguage":"en-GB"},{"@type":"WebPage","@id":"https:\/\/www.jasperproducts.co.uk\/news\/rail-maintenance-platform\/","url":"https:\/\/www.jasperproducts.co.uk\/news\/rail-maintenance-platform\/","name":"GRP Rail Maintenance Walkway &amp; Platform","isPartOf":{"@id":"https:\/\/www.jasperproducts.co.uk\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.jasperproducts.co.uk\/news\/rail-maintenance-platform\/#primaryimage"},"image":{"@id":"https:\/\/www.jasperproducts.co.uk\/news\/rail-maintenance-platform\/#primaryimage"},"thumbnailUrl":"https:\/\/www.jasperproducts.co.uk\/news\/wp-content\/uploads\/2021\/11\/IMG-20190331-WA0002-4.png","datePublished":"2021-12-02T09:42:11+00:00","dateModified":"2026-02-10T13:30:38+00:00","description":"Discover how Jasper Products engineered and installed a 560m GRP rail maintenance walkway at Victoria depot, designed to meet Railway Group Standards with precision and safety.","breadcrumb":{"@id":"https:\/\/www.jasperproducts.co.uk\/news\/rail-maintenance-platform\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.jasperproducts.co.uk\/news\/rail-maintenance-platform\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.jasperproducts.co.uk\/news\/rail-maintenance-platform\/#primaryimage","url":"https:\/\/www.jasperproducts.co.uk\/news\/wp-content\/uploads\/2021\/11\/IMG-20190331-WA0002-4.png","contentUrl":"https:\/\/www.jasperproducts.co.uk\/news\/wp-content\/uploads\/2021\/11\/IMG-20190331-WA0002-4.png","width":1024,"height":398},{"@type":"BreadcrumbList","@id":"https:\/\/www.jasperproducts.co.uk\/news\/rail-maintenance-platform\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.jasperproducts.co.uk\/news\/"},{"@type":"ListItem","position":2,"name":"GRP Rail Maintenance Walkway &amp; Platform"}]},{"@type":"WebSite","@id":"https:\/\/www.jasperproducts.co.uk\/news\/#website","url":"https:\/\/www.jasperproducts.co.uk\/news\/","name":"Jasper Products News","description":"Latest News about Aluminium work Platforms","publisher":{"@id":"https:\/\/www.jasperproducts.co.uk\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.jasperproducts.co.uk\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Organization","@id":"https:\/\/www.jasperproducts.co.uk\/news\/#organization","name":"Jasper Products News","url":"https:\/\/www.jasperproducts.co.uk\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.jasperproducts.co.uk\/news\/#\/schema\/logo\/image\/","url":"https:\/\/www.jasperproducts.co.uk\/news\/wp-content\/uploads\/2026\/02\/cropped-301103577_184198737330913_2960838573356138074_n.jpg","contentUrl":"https:\/\/www.jasperproducts.co.uk\/news\/wp-content\/uploads\/2026\/02\/cropped-301103577_184198737330913_2960838573356138074_n.jpg","width":512,"height":512,"caption":"Jasper Products News"},"image":{"@id":"https:\/\/www.jasperproducts.co.uk\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/JasperProductsLtd","https:\/\/www.youtube.com\/@JasperProducts-v7y"]},{"@type":"Person","@id":"https:\/\/www.jasperproducts.co.uk\/news\/#\/schema\/person\/451004a0120698172de889fcca133f32","name":"JPL","image":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/secure.gravatar.com\/avatar\/8c14b4bc180d7c3cbafbbf89703fdd5287849e7cc54b4b21f987675433b776fd?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/8c14b4bc180d7c3cbafbbf89703fdd5287849e7cc54b4b21f987675433b776fd?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/8c14b4bc180d7c3cbafbbf89703fdd5287849e7cc54b4b21f987675433b776fd?s=96&d=mm&r=g","caption":"JPL"},"url":"https:\/\/www.jasperproducts.co.uk\/news\/author\/jasper_products\/"}]}},"_links":{"self":[{"href":"https:\/\/www.jasperproducts.co.uk\/news\/wp-json\/wp\/v2\/posts\/244","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.jasperproducts.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.jasperproducts.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.jasperproducts.co.uk\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.jasperproducts.co.uk\/news\/wp-json\/wp\/v2\/comments?post=244"}],"version-history":[{"count":2,"href":"https:\/\/www.jasperproducts.co.uk\/news\/wp-json\/wp\/v2\/posts\/244\/revisions"}],"predecessor-version":[{"id":565,"href":"https:\/\/www.jasperproducts.co.uk\/news\/wp-json\/wp\/v2\/posts\/244\/revisions\/565"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.jasperproducts.co.uk\/news\/wp-json\/wp\/v2\/media\/246"}],"wp:attachment":[{"href":"https:\/\/www.jasperproducts.co.uk\/news\/wp-json\/wp\/v2\/media?parent=244"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.jasperproducts.co.uk\/news\/wp-json\/wp\/v2\/categories?post=244"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.jasperproducts.co.uk\/news\/wp-json\/wp\/v2\/tags?post=244"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}